Sunday, October 4, 2026
Home Opportunities Local Jobs Shift Foreman x2 at KKM JV

Shift Foreman x2 at KKM JV

225

LESOTHO HIGHLANDS WATER PROJECT – PHASE II

Construction of Polihali Transfer Tunnel

Contract No.: LHDA C4021

KKM JV, a joint venture comprising Yellow River Co. Ltd., Sinohydro Bureau 3 Co. Ltd., and Unik Civil Engineering Pty Ltd, is the appointed contractor for the Construction of the Polihali Transfer Tunnel—a critical component of the Lesotho Highlands Water Project – Phase II. This project facilitates water transfer via the Katse Reservoir, through the Transfer Tunnel and Delivery Tunnel, to the Ash River Outfall in South Africa, ultimately reaching the Vaal Dam in Gauteng.


Shift Foreman

Number of Positions: 2
Qualification: College Diploma
Experience: Minimum of 15 years’ tunnel experience, 10 years as foreman, 7 years with proposed TBM in similar size tunnel, 3 years with precast segmental tunnel
Added Advantage: Trade Test

Note

  • The TBM used for tunneling has an excavation diameter of 5.35–5.38 m and installs 4.5 m inner-diameter segmental linings.
  • The PCTL is installed ring by ring, with each ring consisting of four standard segments and two wedge segments (1.5 m wide, concrete grade C60), forming a tunnel lining of 4.5 m inner diameter.

How to Apply

Applications must include:

  • Application letter (specifying the position applied for)
  • Detailed CV
  • Certified copies of educational certificates
  • Three work-related referees with contact details (one must be from a current/previous supervisor or employer)

Submission:

Closing Date:

  • 30 September 2025. Applications received after the closing date will not be considered.

Disclaimer:

  • The response period is 14 days after publication.

Comments

Selibeng.com
Whether you are looking for your first job, a better job or just want to manage the direction of your career, explore educational opportunities, and/or pursue entrepreneurship, Selibeng.com offers the resources you need to make it happen.