LESOTHO HIGHLANDS WATER PROJECT – PHASE II
Construction of Polihali Transfer Tunnel
Contract No.: LHDA C4021
KKM JV, a joint venture comprising Yellow River Co. Ltd., Sinohydro Bureau 3 Co. Ltd., and Unik Civil Engineering Pty Ltd, is the appointed contractor for the Construction of the Polihali Transfer Tunnel—a critical component of the Lesotho Highlands Water Project – Phase II. This project facilitates water transfer via the Katse Reservoir, through the Transfer Tunnel and Delivery Tunnel, to the Ash River Outfall in South Africa, ultimately reaching the Vaal Dam in Gauteng.
PCTL Manufacturer Project Manager
Number of Positions: 1
Qualification: Bachelor’s Degree
Experience: Minimum of 10 years’ experience in precast concrete manufacturing and at least two tunnel projects of comparable size and type
Added Advantage: Experience with TBM tunneling (see note below)
Note
- The TBM used for tunneling has an excavation diameter of 5.35–5.38 m and installs 4.5 m inner-diameter segmental linings.
- The PCTL is installed ring by ring, with each ring consisting of four standard segments and two wedge segments (1.5 m wide, concrete grade C60), forming a tunnel lining of 4.5 m inner diameter.
How to Apply
Applications must include:
- Application letter (specifying the position applied for)
- Detailed CV
- Certified copies of educational certificates
- Three work-related referees with contact details (one must be from a current/previous supervisor or employer)
Submission:
- Email applications in read-only PDF format to: [email protected]
Closing Date:
- 30 September 2025. Applications received after the closing date will not be considered.
Disclaimer:
- The response period is 14 days after publication.